Norwegian Spirit With 2.1K Passengers Arrives At Currimao Port

Currimao Port comes alive as the Norwegian Spirit arrives with 2,104 passengers. A vibrant Christmas for all.

Philippine Tourism Did ‘Exceptionally Well’ With Record-High 2024 Receipt

Tourism in the Philippines exceeds pre-pandemic levels in 2024, showcasing the country’s recovery and growth.

Borongan City Logs Rise In Tourist Arrivals With Regular Flights

Borongan City is thriving in tourism, reporting 85,000 arrivals from January to September 2024.

Government Confident Of Exceeding 2024 Revenue Goal; Deficit Within Target

The government is assured of reaching revenue targets despite lower collection figures.

DOE Assures No Constraint Of Fuel Supply Despite Power Plant Outrage

The Department of Energy disclosed that there is nothing to worry about the fuel supply amid the forced outages of generating plants in Luzon.
By Society Magazine

DOE Assures No Constraint Of Fuel Supply Despite Power Plant Outrage

0
0

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

Energy Secretary Raphael P.M. Lotilla assured the public that there is no fuel supply constraint after some power generating plants servicing the Luzon Grid went on simultaneous forced outages this morning.

“We assure the public that the DoE is verifying the cause of the forced outages this morning as there appears to be no fuel supply constraints. A team from the DOE will conduct actual physical spot checks and validate the condition of the transmission lines and the affected power plants,” the Secretary said.

Luzon Grid is on red alert for interval hours from 1:00 – 6:00 PM today and on the yellow alert status on interval hours from 10 AM – 1:00 PM and 5:00 PM – 9:00 PM tonight, according to the grid operator.

When reserves fall below ideal levels, a yellow alert is placed over the grid. When supply-demand balance worsens, a red alert, which points to severe power deficiency that may lead to rotating power interruptions, is declared.

Meanwhile, DoE was informed by the Manila Electric Company (Meralco) that it has advised its Interruptible Load Program (ILP) participants of possible manual load dropping. The ILP participants may run their facilities to allow more grid capacity to serve other customers.