Taiwan Opens New Tourism Info Center In Philippines

Explore Taiwan with ease as the first tourism info center opens in the Philippines, bridging the gap for travelers.

DOT To Continue Building Sustainable Philippine Tourism

Sustainable tourism continues to be a priority for the DOT, assuring an inclusive approach for all.

Government Certifies PHP4.5 Trillion Investments For Green Lane

PHP4.5 trillion in investments certified under the Green Lane will enhance operational efficiency for strategic projects across the nation.

CCC Urges LGUs To Keep Enhancing Climate Change Action Plans

The CCC calls on LGUs to elevate their Local Climate Change Action Plans to ensure preparedness.

DOE Assures No Constraint Of Fuel Supply Despite Power Plant Outrage

The Department of Energy disclosed that there is nothing to worry about the fuel supply amid the forced outages of generating plants in Luzon.
By Society Magazine

DOE Assures No Constraint Of Fuel Supply Despite Power Plant Outrage

0
0

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

Energy Secretary Raphael P.M. Lotilla assured the public that there is no fuel supply constraint after some power generating plants servicing the Luzon Grid went on simultaneous forced outages this morning.

“We assure the public that the DoE is verifying the cause of the forced outages this morning as there appears to be no fuel supply constraints. A team from the DOE will conduct actual physical spot checks and validate the condition of the transmission lines and the affected power plants,” the Secretary said.

Luzon Grid is on red alert for interval hours from 1:00 – 6:00 PM today and on the yellow alert status on interval hours from 10 AM – 1:00 PM and 5:00 PM – 9:00 PM tonight, according to the grid operator.

When reserves fall below ideal levels, a yellow alert is placed over the grid. When supply-demand balance worsens, a red alert, which points to severe power deficiency that may lead to rotating power interruptions, is declared.

Meanwhile, DoE was informed by the Manila Electric Company (Meralco) that it has advised its Interruptible Load Program (ILP) participants of possible manual load dropping. The ILP participants may run their facilities to allow more grid capacity to serve other customers.